this will vary, for a domestic patio deck we typically recommend a simple concrete base and our own wpc joists. the maximum recommended space between joist rows depends on the angle at which you intend to lay your boards in relation to the joists, but should never exceed 40cm, . 2: fix decking boards to joists.

a new precast concrete deck system for . - springer link

12. erect each deck panel using the specified lifting points and place it on the deck support system. 13. use backer rod to fill the gaps between adjacent deck panels and clean/moist the joint surfaces. 14. pour flowable concrete/grout in the transverse joints between deck panels. fig. 1. (continued). a new precast concrete.

13 clever deck designs to consider - forbes

19 may 2015 . a deck can beautifully bridge the gap between indoors and out, providing an inviting, comfortable space from which to enjoy your backyard. combining wood decking with concrete elements — like the low wall and stairs shown here — works especially well with contemporary, modern and urban homes.

residential timber decks close to or on the ground - qbcc

when designing and building timber decks where timber is less than 400 mm from or on the ground, considerations must be given to the . on a well drained gravel/sand or concrete base as long as they are of minimum in-ground . the gaps between boards, particularly over joists, cleared of debris. recoating should be.

an ingenious way to fill gaps between concrete driveway slabs .

15 jun 2012 . dear tim: my concrete driveway has eight large slabs. the driveway slopes down from my garage to the street. the straight-line gaps between the slabs has enlarged, and some cracks are as wide as 2 inches now. i patch them and they open up again. is there a guaranteed way to repair these cracks so i.

why there is a gap between the concrete deck and the ground .

put the screening in 2" deep under the edging stone or cinder block and place them along the edge leaving a 1" gap between the stone and the concrete. pour screening between the stone and the concrete to fill the gap. the stone should help re enforce the soil under the poured concrete and the screening will provide.

rust-oleum restore 10 fl. oz. crack filler for concrete and wood .

this rust-oleum restore crack filler for concrete and wood is suitable for use on wood and composite decks, concrete patios, walks and steps.

how to build a timber deck - wickes.co.uk

gaps between decking boards should be at least 5mm to allow for expansion and for rainwater to drain through freely – cut a piece of timber to 5mm and use between boards for a consistent gap (wickes. fix the posts concrete the posts into the ground adjacent to the deck, or secure them firmly to the deck frame posts.

caulking gap between building and sidewalk - maintenance and .

30 jun 2014 . small gaps between concrete sidewalks and exterior walls might not seem like a big problem today, but could cause soil erosion, foundation damage and of course damage to the sidewalk in the future. don't forget to watch more of these helpful videos and increase your knowledge about construction,.

how to lay a deck | wickes.co.uk

when designing the deck, remember to factor in gaps of 5-8mm between deck boards into your plans. we would advise that you plan your deck to fit only whole deck boards, to avoid having to cut a deck board lengthways to fill a gap. an existing patio or concrete base can be used as a solid foundation for your deck.

caulking concrete cracks | family handyman

cracks and gaps in concrete are more than just an eyesore. water can get into the joints, freeze and then expand, making the cracks even larger. gaps against a house can direct water against the foundation, leading to more problems. once a year, go around your home and fill these gaps and joints with urethane caulk to.

fixing decking posts | decking - ultimate handyman

fill hole with gravel. now we have emptied a bag of gravel into the hole, this will fill the gaps between the pieces of concrete that we put in the hole first. postcrete. now it is time to add a couple of bags of postcrete. there are several different brands of this and they do vary in quality a little . the beauty of these products is that.

decking - itm

temporary braces to the pile to secure it in position while concrete is poured in . or concrete. the 100 x 75 mm bearer should be bolted to the corner piles on the front edge of the deck using a 12 mm bolt with a 50 x 50 x 3 mm washer under the . the next boards, using a 75 mm nail to set the space between the boards.

what should i do about the gap between my house and the patio .